Lean Methodology Practices With Reference to Manufacturing Unit – An Experimental Analysis
Author(s)
Download Full PDF Pages: 22-31 | Views: 1056 | Downloads: 230 | DOI: 10.5281/zenodo.3456006
Abstract
The purpose of this research paper is to examine how efficient improvement in productivity can be achieved in a selected industry by deploying Lean Manufacturing Principles & Tools. Current shop floor scenarios of the Main assembly process were discussed and improvement areas were identified were lean techniques were used to reduce the production lead time. The study used most efficient Lean methodologies such as Root cause analysis, Kaizen, MUDA & TAKT time for eliminating wastes, controlling quality and improving overall performance of the more time consuming operations of the various Main assembly processes. Time study also performed to identify the more time consuming sub processes of each of the Main assembly processes. QC tools such as Pareto chart and Cause & effect diagram were used for analysing collected data. The main aspect is to reduce the production lead time through lean techniques. After application of Lean techniques in more time consuming areas of the Main assembly process in the selected industry, there was reduction in lead time of about 20% i.e. 5 to 4 days/unit and reduction in Man hour rate of 14.3% from 112 Man Hours to 96 Man Hours Overall the production capacity was increased to 16.7% (1.2 to 1.4 Units/day) by adopting Lean methodology
Keywords
Man hours, pitch time, line-balancing, Muda, Takt time
References
i. Anabela C. Alves, José Dinis‐Carvalho, Rui M. Sousa, (2012) "Lean production as promoter of thinkers to achieve companies' agility", The Learning Organization, Vol. 19 Issue: 3, pp.219-237.
ii. Arawati Agus, MohdShukriHajinoor, (2012) "Lean production supply chain management as driver towards enhancing product quality and business performance: Case study of manufacturing companies in Malaysia", International Journal of Quality & Reliability Management, Vol. 29 Issue: 1, pp.92-121.
iii. Bhim Singh, S.K. Garg, S.K. Sharma, Chandandeep Grewal, (2010) "Lean implementation and its benefits to production industry", International Journal of Lean Six Sigma, Vol. 1 Issue: 2, pp.157-168.
iv. Khalil A. El-Namrouty, Mohammed S. AbuShaaban, (2013) “Seven wastes elimination targeted by lean manufacturing case study “gaza strip manufacturing firms’’, International Journal of Economics, Finance and Management Sciences.
v. JP Womack, DT Jones – (2010) “Lean Thinking: Banish Waste and Create Wealth in you Corporation”, International Journal of Operation Management, Vol 30, Issue: 2, pp 180- 217.
vi. Raymond N. Cheser, (2010) "THE EFFECT OF JAPANESE KAIZEN ON EMPLOYEE MOTIVATION IN U.S. MANUFACTURING", The International Journal of Organizational Analysis, Vol. 6 Issue: 3, pp.197-217.
vii. Shams Rahman, TritosLaosirihongthong, Amrik S. Sohal, (2010) "Impact of lean strategy on operational performance: a study of Thai manufacturing companies", Journal of Manufacturing Technology Management, Vol. 21 Issue: 7, pp.839-852.
viii. Steven Brown, JoergDomaschke (2011) ‘Cycle Time Reductions for Test Area Bottleneck Equipment ‘Journal of Business and Management’ Volume 16, Issue 4. Ver. III, pp. 65-69
Cite this Article: