Effect of Building Information Modelling On Construction Projects Risks Management in Kenya
Author(s)
Daniel Mwangi Thiong’o , Dr. Yusuf Muchelule ,
Download Full PDF Pages: 53-64 | Views: 699 | Downloads: 188 | DOI: 10.5281/zenodo.3528047
Abstract
The main aim of this paper was to establish the effect of Building Information Modelling (BIM) in the management of construction projects risks in Kenya. The study target population is 462 registered consulting architects and engineers in Nairobi City County where explanatory survey research was used. A simple and random sampling technique was to select the respondents for the study. The research data were collected by use of questionnaires and secondary data collected from journals and publications. The data were analysed both qualitatively and quantitatively using SPSS version 24. The study revealed that BIM design and visualization reduces the risk of making changes later in the project. Also, cost estimation and budgeting increase construction project’s risk management. Moreover, BIM scheduling provides the project team a very powerful four-dimensional representation of the project which is effective in construction project risk management. Further, BIM multi-disciplinary collaboration & coordination makes it relatively simple to make a change to the building model thereby effectively managing construction project risk. There is, therefore, a need for contractors to utilize BIM for project design to have a more accurate and realistic design. As well, there is need for contractors to utilize BIM since it is a better cost estimation tool. Also, it is utmost necessary to use BIM to facilitate resource optimization and better tracking of project activities. Finally, contractors could also utilize BIM to mitigate the risk of double-counting of materials from different disciplines
Keywords
Building Information Modelling (BIM), cost estimation, BIM scheduling, construction projects risks
References
i. Abugabah, A., Sanzogni, L., & Poropat, A. (2009). The Impact of Information Systems on User Performance: A Critical Review and Theoretical Model.
ii. Al-Haderi, D. S. (2014). The Influence of Govenment Support in Accepting the Information Technology in Public Organization Culture. International Journal of Business and Social Science, 118-124.
iii. Al-Mashta, S. (2010). Integrated Cost Budgeting and Cost Estimation Model for Building Projects. MSc. Thesis, Concordia University, Canada.
iv. Aranda-Mena, G., Crawford, J., Chevez, A., & Froese, T. (2009). Building Information Modelling Demystified: Does it make business sense to adopt BIM? International journal of managing projects in business, Vol.2, Issue 3, 419-434.
v. Autodesk. (2007). BIM and Cost Estimating. Autodesk Inc.
vi. Bagozzi, R. P., Davis, F. D., & Warshaw, P. R. (1992). Development and Test of a Theory of Technological Learning and Usage. Human Relations, 45(7), 660-686.
vii. Blanco, F. G., & Chen, H. (2014). The Implementation of Building Information Modelling in the United Kingdom by the Transport Industry. The 9th International Conference on Traffic and Transportation Studies (ICTTS'2014) (pp. 510-520). Leeds, United Kingdom: Elsevier Ltd.
viii. Calvert, N. (2013, December 12). 4D BIM for Construction: 10 Points and the Benefits of BIM. Retrieved from Synchro Software Blog: http://blog.synchroltd.com/10-points-and-the-benefits-of-bim
ix. Davis, F. D. (1989). Percieved Usefulness, Percieved Ease of Use, and User Acceptance of Information Technology. MIS Quarterly, 319-340.
x. Deitrick, M. (2007). Building Information Modelling (BIM): Demystifying BIM. Michigan. Deloitte. (2017). Africa Construction Trends Report.
xi. Durodolu, O. O. (2016). Technology Acceptance Model as a predictor of using information system to acquire information literacy skills. Library Philosophy and Practice.
xii. Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013). BIM implementation throughout the UK construction project lifecycle: An analysis. Automation in Construction, 145-151.
xiii. Elbeltagi, E., Hosny, O., Dawood, M., & Elhakeem, A. (2014). BIM-Based Cost Estimation/Monitoring For Building Construction. International Journal of Engineering Research and Applications, 56-66.
xiv. Fernandez, R. H. (2014). Strategies to reduce the risk of building collapse in developing countries. Pittsburgh. Gitee, P. W., & Muchelule, Y. (2018). Effect of Building Information Modelling on Projects Implementation: A Case of Nairobi County. International Journal of Civil and Structural Engineering Research Vol.6 (1), 83-90.
xv. Ivanikiw, A. (2007). Contractor's Guide to BIM. Demystifying BIM. Livonia, Michigan.
xvi. Jabri, S. A. (2015, September 26). How BIM enhance the risk management and mitigation of risk. Retrieved from The BIM Hub: https://thebimhub.com/2015/09/26/how-bim-enhance-the-risk-management-and- mitigation/#.WyICuoozaUl
xvii. Kagai, D. (2017, January 26). Why builders are rushing to adopt new technology. Retrieved from Construction Kenya: https://www.constructionkenya.com/3479/kenya-builders-prefab-technology/
xviii. Kamardeen, I. (2010). 8D BIM Modelling Tool for Accident Prevention Through Design. Procs 26th Annual ARCOM Conference, (pp. 281-289). Leeds, UK.
xix. Kenya Vision 2030. (2007, October). Retrieved from A Globally Competitive and Prosperous Kenya: https://www.researchictafrica.net/countries/kenya/Kenya_Vision_2030_-_2007.pdf
xx. Kiganda, A. (2017, March 14). Top 4 Factors Driving the Growth of Africa's Construction Industry. Retrieved from Construction Review Online : https://constructionreviewonline.com/2017/03/top-4-factors-driving- the-growth-of-africas-construction-industry
xxi. Lance, P., & Hattori, A. (2016). Sampling Evaluation. Measure Evaluation, 62-64.
xxii. Larrick, J. (2007). What Can the Software Do for You Today? Demystifying BIM. Livonia, Michigan.
xxiii. Lee, C. (2008). BIM: Changing the Construction Industry. PMI Global Congress. Denver, North America: Project Management Institute.
xxiv. Lee, N., Salama, T., & Wang, G. (2014). Building Information Modeling Quality Management in Infrastructure Construction Projects. The 15th International Conference on Computing in Civil and Building Engineering, (pp. 65-72). Orlando.
xxv. Lewis, W., Agarwal, R., & Sambamurthy, V. (2003). Sources of Influence on Beliefs about Information Technology Use: An Empirical Study of Knowledge Workers. MIS Quarterly Vol. 27, No. 4, 657-678. Lindblad, H. (2013). Study of the implementation process of BIM in construction projects. Stockholm.
xxvi. Maina, P. W. (2018). An investigation into the role of Building Information Modelling in reducing costs and time overruns experienced in 2-Dimensional based construction - A survey of construction practitioners in Nairobi County. Nairobi: The University of Nairobi.
xxvii. Mering, M., Aminudin, E., Chai, C., Zakaria, R., Tan, C., Lee, Y., & Redzuan, A. (2017). Adoption of Building Information Modelling in Project Planning Risk Management. Materials Science and Engineering 271.
xxviii. Musyimi, M. M. (2016). Building Information Modelling Adoption in Construction Project Management in Kenya: A Case Study of Nairobi County. Nairobi.
xxix. Mwere, D. (2018, February 25). MPs to question KeNHA over delayed road projects. Retrieved from Daily Nation: https://www.nation.co.ke/news/National-Assembly-MPs-Kenha-road-projects/1056-4319404- sakb2xz/index.html
xxx. Ndemo, B. (2015, July 1). The Role of ICT in Fighting Corruption. Retrieved from Business Daily:https://www.businessdailyafrica.com/analysis/columnists/-The-role-of-ICT-in-fighting-corruption/4259356-2772112-5eabeg/index.html
xxxi. Oso, W., & Onen, D. (2011). A General Guide to Writing Research Proposal and Report: Handbook for Beginning Researchers. Nairobi: Jomo Kenyatta Foundation.
xxxii. Pryke, A. (2016, November 1). BIM: Risk Management During Project's Lifecycle. Retrieved from Royal Institute of Chartered Surveyors (RICS) - isurv: https://www.isurv.com/info/390/features/10379/bim_risk_management_during_a_project_s_life_cycle
xxxiii. Sabol, L. (2008). Challenges in Cost Estimating with Building Information Modelling. Washington DC: Design and Construction Strategies, LLC.
xxxiv. Sekaran, U. (2010). Research Methods for Business: A Skill Building Approach, (4th Ed.). New York: John Wiley & Sons.
xxxv. Sinclair, D. (2018). BIM as a Risk Management Tool. Retrieved from AECOM: https://www.aecom.com/without-limits/article/bim-risk-management-tool/
xxxvi. Soko. (2015, April 22). Poor planning drives cost overruns in construction, pushing up property prices. Retrieved from Soko Directory: http://sokodirectory.com/2015/04/poor-planning-drives-cost-overruns- in-construction-pushing-up-property-prices/
xxxvii. Surendran, P. (2012). Technology Acceptance Model: A Survey of Literature. International Journal of Business and Social Research Vol-2, No.-4, 175-178.
xxxviii. TheBIG5ConstructEastAfrica. (2018). Retrieved from International Building and Construction Show: https://www.thebig5constructeastafrica.com/industry-media/blog/advances-in-building-information- modelling-bim-in-east-africa/
xxxix. Thuita, P. (2017, January 30). Death Traps: Why buildings collapse so frequently in Kenya. Retrieved from Construction Kenya: https://www.constructionkenya.com/2236/buildings-collapse kenya/
xl. Tomek, A., & Matejka, P. (2014). The impact of BIM on risk management as an argument for its implementation in a construction company. Creative Construction Conference 2014, CC2014 (pp. 501-509). Prague, Czech Republic: Elsevier Ltd.
xli. Waigwa, W. (2016, May 12). BIM Around the World: Kenya Awakening to BIM Benefits. Retrieved from BIM Plus: http://www.bimplus.co.uk/people/ken4ya-awak3ening-bim-bene8fits/
xlii. Wang, J., Wang, X., Shou, W., & Xu, B. (2014). Integrating BIM and Augmented Reality for Interactive Architectural Visualisation. Construction Innovation Vol. 14, Issue 4, 453-476.
xliii. Wikipedia. (2018). Building Information Modeling. Retrieved from Wikipedia; The Free Encyclopedia:https://en.wikipedia.org/wiki/Building_information_modeling
xliv. Zou, Y., Kiviniemi, A., & Jones, S. W. (2015). BIM-based Risk Management: Challenges and Opportunities. Proc. of the 32nd CIB W78 Conference, (pp. 847-855). Eindhoven, Netherlands.
Cite this Article: